|
POWER CUTS AND RECONNECTIONS

When is the last payment day to avoid power cuts?
Clients shall pay also until the day before the date of power cuts indicated in the second unpaid bill.
What types of power cuts exist and what is their cost?
The power cuts modalitys established by Resolution N° 095-2004-OS/CD, as their applicable costs to the
users of electricity public service are indicated as follow :
- Single-phase connections, until 10 kW of power, tariffary options BT5A, BT5B y BT6
- Three-phase connections, until 20 kW of power, tariffary options BT5A, BT5B y BT6
- Three-phase connections, until 20 kW of power, tariffary options BT2, BT3 y BT4
- Single-phase connections, until 10 kW of power, tariffary options BT5A, BT5B y BT6
| N° |
Action |
Modality |
Without IGV |
With IGV |
| 1 |
Power cuts |
Fuse or Switch (Cover without Groove) |
3,04 |
3,62 |
| 2 |
Power cuts |
Switch (Cover with Groove) |
3,95 |
4,70 |
| 3 |
Power cuts |
Box of Measurement ( undertaken isolation) |
5,49 |
6,53 |
| 4 |
Power cuts |
Box of Measurement (undertaken isolation blocked) |
20,73 |
24,24 |
| 5 |
Power cuts |
Air Line (joint) |
11,69 |
13,91 |
|
| 6 |
Reconnections |
Fuse or Switch (Cover without Groove) |
3,74 |
4,45 |
| 7 |
Reconnections |
Switch (Cover with Groove) |
4,23 |
5,03 |
| 8 |
Reconnections |
Box of Measurement ( undertaken isolation) |
6,04 |
7,19 |
| 9 |
Reconnections |
Box of Measurement (undertaken isolation blocked) |
19,39 |
23,07 |
| 10 |
Reconnections |
Air Line (joint) |
14,70 |
17,49 |
- Effective amounts from the 04 of January of the 2005.
- Three-phase connections, until 20 kW of power, tariffary options BT5A, BT5B y BT6
| N° |
Action |
Modality |
Without IGV |
With IGV |
| 1 |
Power cuts |
Fuse or Switch (Cover without Groove) |
3,75 |
4,46 |
| 2 |
Power cuts |
Switch (Cover with Groove) |
6,21 |
7,39 |
| 3 |
Power cuts |
Box of Measurement ( undertaken isolation) |
7,85 |
9,34 |
| 4 |
Power cuts |
Box of Measurement (undertaken isolation blocked) |
20,44 |
24,32 |
| 5 |
Power cuts |
Air Line (joint) |
16,56 |
19,71 |
|
| 6 |
Reconnections |
Fuse or Switch (Cover without Groove) |
5,08 |
6,05 |
| 7 |
Reconnections |
Switch (Cover with Groove) |
6,83 |
8,13 |
| 8 |
Reconnections |
Box of Measurement ( undertaken isolation) |
8,98 |
10,69 |
| 9 |
Reconnections |
Box of Measurement (undertaken isolation blocked) |
19,42 |
23,11 |
| 10 |
Reconnections |
Air Line (joint) |
20,66 |
24,59 |
- Effective amounts from the 04 of January of the 2005.
- Three-phase connections, until 20 kW of power, tariffary options BT2, BT3 y BT4
| N° |
Action |
Modality |
Without IGV |
With IGV |
| 1 |
Power cuts |
Fuse or Switch (Cover without Groove) |
13,67 |
16,23 |
| 2 |
Power cuts |
Switch (Cover with Groove) |
17,66 |
20,97 |
| 3 |
Power cuts |
Box of Measurement ( undertaken isolation) |
19,31 |
22,93 |
| 4 |
Power cuts |
Box of Measurement (undertaken isolation blocked) |
22,79 |
27,05 |
|
| 5 |
Reconnections |
Fuse or Switch (Cover without Groove) |
21,84 |
25,99 |
| 6 |
Reconnections |
Switch (Cover with Groove) |
18,47 |
21,98 |
| 7 |
Reconnections |
Box of Measurement ( undertaken isolation) |
27,55 |
32,78 |
| 8 |
Reconnections |
Air Line (joint) |
33,56 |
39,94 |
- Effective amounts from the 04 of January of the 2005.
Why isn’t the client noticed before cutting
electric power?
- In conformity with the current provisions (Article 90
of the Electrical Concession Law), the Dealer shall cut the electric power without previous notice to the
user, when two or more bills are outstanding.
Power shall be cut, should a breach of the payment agreement occur.
- In order to provide a better service to our clients, Luz del
Sur’s bills include the date of power cuts corresponding to the unpaid months.
Why do you charge consecutive power cuts if
electricity was cut off only once?
The consecutive power cuts are made and charged if the routine inspection reveals that electricity supply was
reconnected without the Company’s authorization. That can be confirmed when the meter shows an increase of power
during the inspection after the cut.
Why can’t I request the temporary cut of my tenant’s electric supply if he owes me rents or
if I have taken a legal action against him?
Because the Company is authorized to cut power only when there are two or more outstanding bills of electricity
supply (Article 90° of the Law on Electrical Concessions).
Furthermore, the Law empowers us to cut power when default in the installations puts human or material safety
at risk, or when electrical power is used without our authorization.
¿Why do you charge electricity consumption if service was cut off last month?
- The amount of the bill considers the consumption from the date
of the last meter reading to the date of the power cut.
Example: Meter reading was on May 3rd and power cut on May 10th, therefore seven days of consumption have to
be billed.
- Additionally, the following charges are billed regardless of
monthly energy consumption:
I. Fixed Charge.
II. Maintenance and replacement charges.
III. Public lighting aliquot.
IV. Power (for non- BT5 clients).
How many unpaid months can lead to a power cut?
Two months, or the breach of a payment agreement (due to debt or illegal connection).
Why has electricity been cut off if I have made all payments in time?
The following causes may be considered upon making a query in the power supply information system:
- Failure in the premise’s main switchboard (internal failure).
- Meter failure.
- Power cut in the area.
- Thermomagnetic switch opening (current limiter) due to excessive
power demand.
Fonoluz :
We will register your request. Please, check if the master key is in good condition; should an internal failure exist,
please contact us (in order to cancel the request).
Branch Offices:
We will register your request. Please, check if the master key is in good condition; should an internal failure exist,
please contact Fonoluz at 617-5000 (in order to cancel the request).
Who determines power cut and reconnection costs?
The Cognizant authority, Commission for Energy Rates (GART - spanish abbreviation ), in conformity
with a Regulator Procedure that preceded the Resolution N° 095-2004-OS/CD on 05 of May of the 2004, fixed
the maximum payments of power cuts and reconnections applicables to the clients. This payments are being
updated according to dispositions expressed in that resolution.

©2000
Luz del Sur. Todos los derechos reservados.
|