|
Obtaining a new power supply
General requirements
If you need a new connection, a load increase or decrease, transfer to three-phase with or without
power modification, rehabilitation of service or meter transfer, please take into account the
following requirements:
-
The owner of the house or a third party duly authorized by him/her through a proxy letter and
authenticated signature, should carry out the arrangements at the commercial office.
-
The meter box should be located where there is free and permanent access for the company personnel,
that is, at the limit of the public thoroughfare, at the edge of the municipal sidewalk, without
elements that prevent access.
-
For the immediate location of the property, show the address at the front of the property. Also the
interior installations in charge of the user should be ready.
-
In the event you already have energy supply, your payments should be up to date.
-
Identify whether it is a single family or multi family household.
Specific requirements
For information please enter the corresponding section:
©2000
Luz del Sur. Todos los derechos reservados.
|